Telephone: 0845 0941 885
Follow link below or call for course booking or more information.
T: 0845 0941 885

This article was published in: Fire Risk Management
The International Journal for Fire Professionals – May 2008
Architects, building designers, Fire Engineers, Building Control, Approved Inspectors, The Fire Service, Fire Safety Professionals, Fire Risk Assessors and Building Managers
| Seminar programme | |
|---|---|
| 09.00 | Registration |
| 09.30 | Introduction |
| 09.45 | Development and the standard’s status General principles of the risk base "advanced approach" |
| ASET and time-based analysis Time line analysis based on available safe egress time | |
| 10.40 | Refreshment break |
| 11.00 | Risk profiling Occupancy characteristic of premises and fire growth rate |
| Minimum provision determination Identifying minimum fire protection measures for premises | |
| 12.30 | Lunch |
| 13.30 | Additional measures Considerations such as ceilings heights, sprinklers and AFD |
| Limits of applicability Maximum acceptable variations allowed | |
| 14.40 | Refreshment break |
| 15.00 | Applying BS 9999 - case study Interactive session in applying the code to premises |
| 16.00 | Questions and answers |
| 17.00 | Close |
ABE members £150, Non-members £195 plus VAT at the current rate
Booking form at bottom of page
| February | |
|---|---|
| 25th | London |
| March | |
| 3rd 9th 26th 30th |
Londonderry Brighton Penrith Newmarket |
| April | |
| 2nd | Stockport |
Delegates receive 6 hours continuing professional development when attending this seminar
This seminar has been assessed by the CPD certification service
ABE and Xact reserves the right to change the above programme without warning